Monday, July 29, 2024

Design Wall

 


Split Ninepatch is on the design wall this week.  I will have to move it to the floor, as my design wall is not big enough to lay out all the blocks. Once they are layed out, I will start sewing the rows. I also hope to get Fairy Duster laid out and ready to sew all the blocks together this week.


I am also working on some mesh bags for a friend of mine. Here are few of them ready to sew up. Hope to have all of these done this week.
As always, many projects in the works for me. How about you?
Have a great week!

Stash Report



Nothing added to the stash this week and nothing finished. I did take some time to prep 4 more blocks for the Heart and Hand quilt. These are two of the July blocks that I hope to finish this week.


Strips are cut for the insde border on the Fairy Dust quilt. Hope to have the center completed this week.
No changes to the stash this week.

Used this week: 0 yards.
Used YTD: 114.5 yards.
Purchased this week: 0yards.
Purchased YTD: 80 yards.
Net Fabric Used YTD: 34.5 yards.

Happy Sewing!

Monday, July 22, 2024

Design Wall


Nine Alternate blocks cut out and ready to sew. Hoping to finish these up and start putting the Fairy Dust quilt all together. More split nine patch blocks will be worked on tomorrow at my sewing group.
Busy week for me, how about you?

Sunday, July 21, 2024

Stash Report


This weeks stash report included some neutrals purchased at Mulqueens, while I was there for my Longarm quilting meeting. It was Christmas in July, so could not pass up the great prices on fabric. The bottom kitty fabric will be used for a quilt for one of my granddaughters that loves cats!

 At my Longarm meeting, we worked on cutting out blocks for QOV. Next meeting in August we will be putting together another quilt.

So here is the damage for the week:

Used this week: 0 yards.
Used YTD: 114.5 yards.
Purchased this week: 3.5 yards.
Purchased YTD: 80 yards.
Net Fabric Used YTD: 34.5 yards.

Happy Sewing!

Monday, July 15, 2024

Design Wall


The last of the paper peiced blocks for Fairy Dust are finished. Now to work on the alternate block and hopefully start putting this quilt together. At my sewing group this week I will also be working on more of the split nine patch blocks. I have about 100 done so far, not sure how many I need but will keep going!

Have a great week!
 

Sunday, July 14, 2024

Stash Report


A small finish this week, a tablerunner from a GE Designs called Lil' Diana. Super easy, using a 5" charm pack. I put this together in a couple of hours during our Sew in for my quilt guild on Tuesday. This will get quilted up later this week and will be put away for the holidays.


Also finished was #11 block for the Fairy Dust Quilt. One more to go!

Nothing added to the stash this week.

Used this week: 2 yards.
Used YTD: 114.5 yards.
Purchased this week: 0 yards.
Purchased YTD: 76.5 yards.
Net Fabric Used YTD: 38 yards.

Monday, July 8, 2024

Design Wall

Back home and back to Quilting!

Block #10 is done! This week I will be working on 11 and 12 and hope to have them completed soon. This quilt is taking along time to do, but I have been working on a few other things in between.

Like these split nine patch blocks during my Tuesday sewing group. Tomorrw we have a sew in with Sunrise Stitchers so will bring more of these along to work on.

Have a great week and stay cool!

Sunday, July 7, 2024

Stash Report

Kanarra Falls

Back home today after a wonderful trip, it was a least a bit cooler than the temps we came home to. 

We took some beautiful hikes in the Cedar City Area, Alpine Pond Loop, Kanarra Falls and Kolob Canyon. The sceanery was beautiful and weather was perfect. 

Second Waterfall

Walking up the canyon in the water.

My favorite hike was up to Kanarra Falls. You have to have a permit to hike this canyon to the falls, as they limit the number of people each day. It was such a beautiful hike and in many places you are walking in the creek, which was only about ankle high. The first waterful has a staricase which you take up to the second waterfall. There is a third waterfall, but that required climbing up some boulders and was a bit much for us.

Cedar Breaks 

Alpine Pond

Some of the wildflowers.

We also went on a fun hike to Alpine Pond in Cedar Breaks NM. It was a beautiful hike with so many different wildflowers blooming and great views of Cedar Breaks Amphitheater. Late June, early July is the perfect time to vist Cedar Breaks.

Double Arch Alcove

We also headed into the Kolob Canyon part of Zion National Park, and hiked Tayler Creek Trail. It was a 5 miler and we were glad we did it in the morning, as it started to get hot on the way back. This also follows a small creek that you have to cross about 20 times and ends at a Double Arch above. We had a busy week and loved every minute.

No Quilt shops to visit, so no chage in the stash.

Used this week: 0 yards.
Used YTD: 112.5 yards.
Purchased this week: 0 yards.
Purchased YTD: 76.5 yards.
Net Fabric Used YTD: 36 yards.

Thursday, July 4, 2024

Design Wall

Happy Fourth of July!

We are on our road trip to Cedar City and enjoying the Parade and later today fireworks.





More fun pictures from the Parade in Cedar City. We had a great time and are heading to the park for more festivities and later fireworks at the Airport.

Nothing on the design wall this week, check back next week when I get home.

Happy 4th!